{"id":3302,"date":"2022-11-17T15:25:11","date_gmt":"2022-11-17T14:25:11","guid":{"rendered":"https:\/\/www.pkvarel.com\/?p=3302"},"modified":"2022-11-17T15:25:11","modified_gmt":"2022-11-17T14:25:11","slug":"new-hall-built-over-ongoing-operations","status":"publish","type":"post","link":"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/","title":{"rendered":"New hall built over ongoing operations"},"content":{"rendered":"\n<p><\/p>\n\n\n\n<p>The new hall enables improved workflows in waste paper pulping with a new hall crane, a new dump chest provides intermediate storage capacity on the way to the board machines, and at the same time the equipment in stock preparation has received a modern process control system for improved control. All during ongoing operations, including new pile foundations in the fall of 2020 and construction of the new hall in and above the existing building. This was followed by demolition of the old hall in the course of 2021 and finally, this year, among other things, commissioning of the new dump chest and various other systems.<\/p>\n\n\n\n<p>&#8220;With considerably increased process stability, it is now possible under improved conditions for the plant operators to supply the board machines as continuously with pulp of the desired quality as we envisage&#8221; says the head of board production, Kaj-Ole Wichmann, summarizing the result of the now successfully completed project.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion-1024x576.png\" alt=\"\" class=\"wp-image-3296\" srcset=\"https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion-1024x576.png 1024w, https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion-300x169.png 300w, https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion-768x432.png 768w, https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion-1536x864.png 1536w, https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion.png 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Increased plant availability, more planning reliability and a modernized working environment: PKV&#8217;s cartonboard production needed a new hall for all these goals. The challenge: to build this replacement on site without paralyzing production. Now the project has been successfully completed.<\/p>\n","protected":false},"author":8,"featured_media":3296,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"ghostkit_customizer_options":"","ghostkit_custom_css":"","ghostkit_custom_js_head":"","ghostkit_custom_js_foot":"","ghostkit_typography":"","footnotes":""},"categories":[113,137],"tags":[],"class_list":["post-3302","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company","category-press"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New hall built over ongoing operations - Papier- und Kartonfabrik Varel<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New hall built over ongoing operations - Papier- und Kartonfabrik Varel\" \/>\n<meta property=\"og:description\" content=\"Increased plant availability, more planning reliability and a modernized working environment: PKV&#039;s cartonboard production needed a new hall for all these goals. The challenge: to build this replacement on site without paralyzing production. Now the project has been successfully completed.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/\" \/>\n<meta property=\"og:site_name\" content=\"Papier- und Kartonfabrik Varel\" \/>\n<meta property=\"article:published_time\" content=\"2022-11-17T14:25:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"pkvklug\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"pkvklug\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/\"},\"author\":{\"name\":\"pkvklug\",\"@id\":\"https:\/\/www.pkvarel.com\/en\/#\/schema\/person\/e9fe7f9f4d85867d18101ff63e3c9897\"},\"headline\":\"New hall built over ongoing operations\",\"datePublished\":\"2022-11-17T14:25:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/\"},\"wordCount\":159,\"image\":{\"@id\":\"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion.png\",\"articleSection\":[\"Company\",\"Press\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/\",\"url\":\"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/\",\"name\":\"New hall built over ongoing operations - Papier- und Kartonfabrik Varel\",\"isPartOf\":{\"@id\":\"https:\/\/www.pkvarel.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion.png\",\"datePublished\":\"2022-11-17T14:25:11+00:00\",\"author\":{\"@id\":\"https:\/\/www.pkvarel.com\/en\/#\/schema\/person\/e9fe7f9f4d85867d18101ff63e3c9897\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/#primaryimage\",\"url\":\"https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion.png\",\"contentUrl\":\"https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion.png\",\"width\":1920,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\/\/www.pkvarel.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New hall built over ongoing operations\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pkvarel.com\/en\/#website\",\"url\":\"https:\/\/www.pkvarel.com\/en\/\",\"name\":\"Papier- und Kartonfabrik Varel\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pkvarel.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.pkvarel.com\/en\/#\/schema\/person\/e9fe7f9f4d85867d18101ff63e3c9897\",\"name\":\"pkvklug\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/f7e2894689ebf35b6a06cd9b50336c7366a371d6a6d98acd419c5a28fd46853b?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/f7e2894689ebf35b6a06cd9b50336c7366a371d6a6d98acd419c5a28fd46853b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/f7e2894689ebf35b6a06cd9b50336c7366a371d6a6d98acd419c5a28fd46853b?s=96&d=mm&r=g\",\"caption\":\"pkvklug\"},\"url\":\"https:\/\/www.pkvarel.com\/en\/author\/pkvklug\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New hall built over ongoing operations - Papier- und Kartonfabrik Varel","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/","og_locale":"en_GB","og_type":"article","og_title":"New hall built over ongoing operations - Papier- und Kartonfabrik Varel","og_description":"Increased plant availability, more planning reliability and a modernized working environment: PKV's cartonboard production needed a new hall for all these goals. The challenge: to build this replacement on site without paralyzing production. Now the project has been successfully completed.","og_url":"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/","og_site_name":"Papier- und Kartonfabrik Varel","article_published_time":"2022-11-17T14:25:11+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion.png","type":"image\/png"}],"author":"pkvklug","twitter_card":"summary_large_image","twitter_misc":{"Written by":"pkvklug","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/#article","isPartOf":{"@id":"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/"},"author":{"name":"pkvklug","@id":"https:\/\/www.pkvarel.com\/en\/#\/schema\/person\/e9fe7f9f4d85867d18101ff63e3c9897"},"headline":"New hall built over ongoing operations","datePublished":"2022-11-17T14:25:11+00:00","mainEntityOfPage":{"@id":"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/"},"wordCount":159,"image":{"@id":"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion.png","articleSection":["Company","Press"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/","url":"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/","name":"New hall built over ongoing operations - Papier- und Kartonfabrik Varel","isPartOf":{"@id":"https:\/\/www.pkvarel.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/#primaryimage"},"image":{"@id":"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion.png","datePublished":"2022-11-17T14:25:11+00:00","author":{"@id":"https:\/\/www.pkvarel.com\/en\/#\/schema\/person\/e9fe7f9f4d85867d18101ff63e3c9897"},"breadcrumb":{"@id":"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/#primaryimage","url":"https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion.png","contentUrl":"https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/11\/pkv_neue_halle_kartonproduktion.png","width":1920,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/www.pkvarel.com\/en\/new-hall-built-over-ongoing-operations\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.pkvarel.com\/en\/"},{"@type":"ListItem","position":2,"name":"New hall built over ongoing operations"}]},{"@type":"WebSite","@id":"https:\/\/www.pkvarel.com\/en\/#website","url":"https:\/\/www.pkvarel.com\/en\/","name":"Papier- und Kartonfabrik Varel","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pkvarel.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/www.pkvarel.com\/en\/#\/schema\/person\/e9fe7f9f4d85867d18101ff63e3c9897","name":"pkvklug","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/f7e2894689ebf35b6a06cd9b50336c7366a371d6a6d98acd419c5a28fd46853b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7e2894689ebf35b6a06cd9b50336c7366a371d6a6d98acd419c5a28fd46853b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7e2894689ebf35b6a06cd9b50336c7366a371d6a6d98acd419c5a28fd46853b?s=96&d=mm&r=g","caption":"pkvklug"},"url":"https:\/\/www.pkvarel.com\/en\/author\/pkvklug\/"}]}},"_links":{"self":[{"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/posts\/3302","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/comments?post=3302"}],"version-history":[{"count":1,"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/posts\/3302\/revisions"}],"predecessor-version":[{"id":3303,"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/posts\/3302\/revisions\/3303"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/media\/3296"}],"wp:attachment":[{"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/media?parent=3302"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/categories?post=3302"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/tags?post=3302"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}