{"id":2688,"date":"2022-02-18T10:13:15","date_gmt":"2022-02-18T09:13:15","guid":{"rendered":"https:\/\/www.pkvarel.com\/?p=2688"},"modified":"2026-02-12T13:33:40","modified_gmt":"2026-02-12T12:33:40","slug":"pm4-new-winder-fit-for-increasing-production-output","status":"publish","type":"post","link":"https:\/\/www.pkvarel.com\/en\/2022\/02\/18\/pm4-new-winder-fit-for-increasing-production-output\/","title":{"rendered":"PM4: New winder fit for increasing production output"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong><strong><strong>With a new winder and an automatic reel transport, Papiermaschine 4, which was rebuilt in 2020, can now further increase its performance curve.<\/strong> <\/strong><\/strong><\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"alignleft size-large is-resized\"><img decoding=\"async\" src=\"https:\/\/www.pkvarel.com\/wp-content\/uploads\/2022\/02\/rsm4_web-1024x682.jpg\" alt=\"\" class=\"wp-image-2683\" width=\"-161\" height=\"-107\" \/><figcaption>New winder for Papiermaschine 4 (PM4)<\/figcaption><\/figure><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The system from the manufacturer Valmet that has now been commissioned comprises a two-drum winder with transfer rails and turntable for reel transport. With a net web width of 5,300 mm, the winder is designed for use with recycled liner types with a basis weight of 100 &#8211; 280 g\/m2. The maximum production speed is 2,700 m\/min. The line is equipped with a dual unwind system. This feature makes it possible to significantly reduce makeready times and thus contributes significantly to a higher performance of the winder.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As a result, the winder capacity of the line is now fit for the further increasing production output of Papiermaschine 4 (PM4). After the rebuild in 2020, PM4 will offer increased production capacity for the established grades Jade White Classic and Jade Kraft within the scope of PKV&#8217;s overall approval.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Here you can see around 12 months of construction and assembly in a time-lapse video: <\/p>\n\n\n\n<div class=\"ghostkit-video\" data-video-type=\"yt_vm_video\" data-video=\"https:\/\/youtu.be\/KbLed4RBd_E\" data-video-aspect-ratio=\"16:9\" data-video-volume=\"100\" data-click-action=\"plain\"><div class=\"ghostkit-video-play-icon\"><\/div><div class=\"ghostkit-video-loading-icon\"><span class=\"ghostkit-svg-icon ghostkit-icon-spinner\"><\/span><\/div><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The Papier- und Kartonfabrik Varel (PKV) will further develop the mill to a production capacity of one million tonnes of corrugated board papers as well as cardboard in the coming years. The raw material for this will remain &#8211; as it has since 1950 &#8211; recycled waste paper. At the same time, PKV continues to improve its energy efficiency through numerous investments. To strengthen and modernise the site, the company is currently implementing a seven-year strategy programme with a total volume of about 280 million euros. PKV has invested around 60 million euros of this in the now completed modernisation of line 4 (Papiermaschine 4 and associated equipment), which alone has improved the line&#8217;s capacity by around 60,000 tonnes per year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We would like to thank these companies (the main ones involved in the project) for the good cooperation:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Actemium Cegelec GmbH, Frankfurt am Main<\/li><li>AFRY Deutschland GmbH, Dresden<\/li><li>Aarsleff Grundbau GmbH, Hamburg<\/li><li>Bassenberg &amp; Schwarting, Rodenkirchen<\/li><li>Butting Anlagenbau GmbH &amp; Co. KG, Schwedt\/Oder<\/li><li>Carstens Maschinenbau GmbH, Varel<\/li><li>C-En Dr.-Ing. Carsten Buchtmann, Georgsmarienh\u00fctte<\/li><li>CM-Montage GmbH, Hopsten<\/li><li>Core Link AB, Falkenberg (Schweden)<\/li><li>Dr. Ecklebe GmbH, Wernigerode<\/li><li>E. u. H. Brunken GmbH &amp; Co.KG, Varel<\/li><li>Ingenieurb\u00fcro Etzweiler, K\u00f6ln<\/li><li>Dipl.-Ing. Hartmut Fangmann, Varel<\/li><li>Fortwengel GmbH, D\u00f6rpen<\/li><li>GEOdEX Ing. B\u00fcro f\u00fcr Umweltplanung, Neustadt am R\u00fcbenberge<\/li><li>Harms Heizung GmbH, Varel<\/li><li>J\u00fcrgen Hellmann GmbH, Oldenburg<\/li><li>IF\u00dcREL Automation GmbH, L\u00fcnen<\/li><li>Isoliertechnik GmbH Oberhausen, Oberhausen<\/li><li>Jagenberg Paper Systems GmbH, Krefeld<\/li><li>KBS Kernbohr Service GmbH, Rastede<\/li><li>Brandschutz Keuchel, Neuss<\/li><li>Kirchner Stahlbau GmbH, Wardenburg<\/li><li>C. Labes GmbH, Varel<\/li><li>Langer E-Technik GmbH, Varel<\/li><li>Max B\u00f6gl Fertigteilwerke GmbH&amp;Co.KG, Liebenau<\/li><li>Minimax GmbH, Achim<\/li><li>MSB, Maschinen-u.Stahlbau GmbH&amp;CoKG, D\u00fcren<\/li><li>Nyblad Maschinen- und Anlagenbau, Papenburg<\/li><li>p+p project automation ag, Schindellegi (Schweiz)<\/li><li>Procemex Ltd., Jyf\u00e4skyl\u00e4 (Finnland)<\/li><li>Rova-Mix Transportbeton + M\u00f6rtel, Varel<\/li><li>Artur Scheffczik, Osnabr\u00fcck<\/li><li>Siemens Energy Global GmbH &amp; Co.KG, Stuttgart<\/li><li>Steenhoff GmbH &amp; Co. KG, Rhauderfehn<\/li><li>St\u00f6bich Brandschutz GmbH, Goslar<\/li><li>Wilhelm Meyer GmbH &amp; Co. KG, Varel<\/li><li>Tischlerei Gerdes GmbH &amp; Co. KG, Jade<\/li><li>Ulferts GmbH, Moormerland<\/li><li>Valmet Technology Oy, Espoo (Finnland)<\/li><li>Valmet GmbH, Darmstadt<\/li><li>Waerag Planungsgesellschaft m.b.H, Wien (\u00d6sterreich)<\/li><li>E&amp;E Wiggers Bedachungen GmbH, Stadland<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With a new winder and an automatic reel transport, Papiermaschine 4, which was rebuilt in 2020, can now further increase its performance curve. The system from the manufacturer Valmet that has now been commissioned comprises a two-drum winder with transfer rails and turntable for reel transport. With a net web width of 5,300 mm, the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":2682,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9,13],"tags":[],"class_list":["post-2688","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company","category-press"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/posts\/2688","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/comments?post=2688"}],"version-history":[{"count":1,"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/posts\/2688\/revisions"}],"predecessor-version":[{"id":5619,"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/posts\/2688\/revisions\/5619"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/media\/2682"}],"wp:attachment":[{"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/media?parent=2688"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/categories?post=2688"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pkvarel.com\/en\/wp-json\/wp\/v2\/tags?post=2688"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}